rehabilitation thermal power plant

Contact Us

Product thermal capacity: 0.7 - 14 MW

Working pressure: 0.7 - 1.25 Mpa

Available fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Available industries: Heat supplying, hospital, hotel.

Introduction

WNS series horizontal internal combustion boiler is classic 3-pass wetback oil/gas fired boiler. After fuel is atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, called 1st pass; the high temperature flue gasses are collected in reversal chamber and then enter 2nd pass, which is grooved tube bundle area through heat convection, air temperature gradually falls and flows to front smoke box and enter 3rd pass, which is done in the smooth tube bundle area, and then through back smoke box lead to chimney and exhausted to the atmosphere.

Technical Advantages

Digitized Manufacture

The key processes including material cutting, rolling, drilling are made by advanced CNC machining process to reduce the assembly stress and extend boiler working lifetime.
The front and back smoke chamber plates are cut by CNC plasma cutting machine with tidy and beautiful look.

Easy Operation and Maintenance

Fully intelligent operation, with automatic adjustment and protection of burning, water level, temperature and steam pressure. The smoke box door uses the hinge structure for easy inspection, inventory and cleaning.

Long Service Life

The way to weld Smoke tube and tube sheet is to first expand to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boiler service life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint are test by radiographic inspection.
Fin tube uses ND steel or stainless-steel material to avoid corrosion in the low temperature.
Inspection stops are set up to guarantee the sequence of expanding and welding to avoid cracking of the tube sheet holes.

Less Fuel Consumption

High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below 45℃ and reduce heat lost.
Sufficient steam storage room and heating area to generate high quality steam and high thermal power.
Condenser is added to recycle the waste heat of the exhausted smoke to increase feeding water’s temperature and reduce flue gas emission temperature and increase the thermal efficiency over 98% and save operating cost.

ISSN 2348 – 7968 Study on Construction Safety i

2015-10-8 · consumption per hr required by plant 850.00 Lit/hr.It required 38.40 (Mt/day)/MW to produce current. Most construction of thermal power plant, repair and maintenance work done during unit shutdowns or period of extensive rehabilitation. This could involve working on one of the following components are steam drum, primary steam piping, boiler

Emerson Helps Longview Power Plant Become One of th

2019-5-31 · Longview Power located in Maidsville, West Virginia. CHALLENGE Since commissioned in 2011, the Longview power plant was beset by a number of operational challenges that compromised its ability to reliably supply power to the grid. After only a few years in operation, a two-year, $140 million plant rehabilitation project was implemented to:

EÜAŞ TUNÇBİLEK THERMAL POWER PLAN

eÜaŞ tunÇbİlek thermal power plant rehabilitation project + project details. project details. project full name delivery of external warning systems, delivery, installation and start-up of new warning system materials for units. client

1 RWE Technology International Thermal Generatio

2018-2-28 · supercritical thermal power plant at several sites 2008 Electric Power Holding Company Russia CDM Measures in TGK4 Power Stations 2008 – 2007 Public Electric Power Company Greece Thermal power plant maintenance benchmark 2007 Power Plant Operator Turkey Review of operational chemistry practices 2007 Electricity Distributor And Power Plant

PREPARATION OF SCOPING STATEMENT FO

2011-11-3 · Scoping Statement for Assessment for Rehabilitation of TPP Kosovo B, Final Report PREPARATION OF SCOPING STATEMENT FOR ENVIRONMENTAL ASSESSMENT FOR REHABILITATION OF THERMAL POWER PLANT KOSOVO B Contract Number EPP–I–00-03–00004-00, Task Order No 11 Prepared for: Dr. Michael L. Boyd Senior Energy Advisor USAID/Kosovo,

India Kothagudem "A" Thermal Power Statio

2012-9-18 · of power generating facilities." The "B" and "C" Power Stations at the Kothagudem Power Plant also required rehabilitation. However, the "A" Power Station was given higher priority because it 1 One generator was excluded from the project because APSEB had already arranged to procure materials and machinery at the time of appraisal.

Philippines: Acquisition and Rehabilitation of th

2018-3-8 · MPPCL's acquisition, rehabilitation, and operation of the Masinloc coalfired thermal - power plant (Masinloc), which is located about 250 kilometers northwest of Manila at the port of Masinloc in Zambales . The facility Province was funded by $150 million a dollar denominated loan and a $50 million equivalent peso denominated loan. ADB's

Chapter 9 Rehabilitation Plan of Thermal Power Plant (

2004-5-11 · Chapter 9 Rehabilitation Plan of Thermal Power Plant 9.1 Summary In this chapter, rehabilitation ofthe existing thermal power plant s was planned. The following is the flow of the examination and summary of this chapter: (1) Survey of the current status of the facilities

Power Plant Retrofit and Modernizati

Plant Rehabilitation Our plant rehabilitation engineers are specialist in evaluating and upgrading generation plant to prolong asset life and improve performance. We have experience in refurbishing power stations around the world. We can devise and implement investment strategies that deliver enhanced asset value.

PROJECT: EMERGENCY POWER INFRASTRUCTUR

2019-6-29 · The objective of the project is to improve the provision of adequate and reliable power supply in an environmentally sound manner through the rehabilitation of the Hwange Power Plant (HPP) and the power transmission and distribution facilities in the country. The envisaged project is situated in Hwange District within Matebeleland Province.

SERVICES OF THE THERMAL POWER DIVISIO

2015-3-16 · SERVICES OF THE THERMAL POWER DIVISION (Outside Japan) WEST JEC has also a lot of worldwide experience of various power projects in Indonesia, Vietnam, Philippines, China, Taiwan, and other countries in Southeast Asia, Kenya, Ethiopia, Turkey, Russia (Kamchatka), and countries in South and Central America.