Product thermal capacity: 0.7 - 14 MW

Working pressure: 0.7 - 1.25 Mpa

Available fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Available industries: Heat supplying, hospital, hotel.

Introduction

WNS series horizontal internal combustion boiler is classic 3-pass wetback oil/gas fired boiler. After fuel is atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, called 1st pass; the high temperature flue gasses are collected in reversal chamber and then enter 2nd pass, which is grooved tube bundle area through heat convection, air temperature gradually falls and flows to front smoke box and enter 3rd pass, which is done in the smooth tube bundle area, and then through back smoke box lead to chimney and exhausted to the atmosphere.

Technical Advantages

Digitized Manufacture

The key processes including material cutting, rolling, drilling are made by advanced CNC machining process to reduce the assembly stress and extend boiler working lifetime.
The front and back smoke chamber plates are cut by CNC plasma cutting machine with tidy and beautiful look.

Easy Operation and Maintenance

Fully intelligent operation, with automatic adjustment and protection of burning, water level, temperature and steam pressure. The smoke box door uses the hinge structure for easy inspection, inventory and cleaning.

Long Service Life

The way to weld Smoke tube and tube sheet is to first expand to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boiler service life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint are test by radiographic inspection.
Fin tube uses ND steel or stainless-steel material to avoid corrosion in the low temperature.
Inspection stops are set up to guarantee the sequence of expanding and welding to avoid cracking of the tube sheet holes.

Less Fuel Consumption

High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below 45℃ and reduce heat lost.
Sufficient steam storage room and heating area to generate high quality steam and high thermal power.
Condenser is added to recycle the waste heat of the exhausted smoke to increase feeding water’s temperature and reduce flue gas emission temperature and increase the thermal efficiency over 98% and save operating cost.

Agrippah Mwangi - Gvt Approved Boiler,Pressure Vesse

Schedule and execute a large volume of boiler inspections: every size, style and type from small power boilers to 50Tons/hour units (e.g. field-erected). • Work closely with clients (government, power utility, commercial, institutional and a large

Boiler Inspection | Outage Maintenance Servi

We have service technicians who travel the world over to identify problems, validate suspicions, and give accurate scope to problems like leaks, operation inefficiencies, hot spots, vibrations, etc. Don't guess – call Industrial Boiler & Mechanical today to schedule an on-site boiler and equipment assessment and get the answers you need.

B.3 PERFORMANCE WORK STATEMENT New Boiler Plan

New Boiler Plant Inspection, Testing, and Calibration VA Central Western Massachusetts, Leeds, MA 1. GENERAL pressure underground steam distribution system serving the space heating, domestic hot water, kitchen equipment, and sterile processing needs. The plant includes a heat recovery steam Boiler water level controllers. 8) Feedwater

TEMPERATURE ADJUSTMENT - RESIDENTIAL ELECTRIC

2011-5-12 · TEMPERATURE ADJUSTMENT - RESIDENTIAL ELECTRIC SETTINGS • Temperature range on residential electric water heater is from 90 ° F to 150 °F, except for A7 circuit, which is 110 °F to 170 °F. • The high limit opens at 170 °F, 190 °F with A7 circuit and can be manually reset.

Retrofitting Domestic Hot Water Heaters for Solar Wate

2015-3-17 · Retrofitting solar domestic hot water systems today commonly consists on series connecting the existing system with a new solar storage upstream and using the existing hot water boiler as a backup heater [25]. Some retrofitted systems make use of thermosyphoning and are therefore dependent on a new well performing storage for that purpose [26

Commercial Boilers - AH

Gas and oil-fired steam and hot water Heating Boilers with inputs ranging from 300 MBH to 2500 MBH, for which published ratings are available. Custom Boilers are excluded from the program scope. Boiler models within a Model Series, or individual boiler models, having inputs over 2500 MBH may be included in the program at the Participant's option.

Third Party Inspection for Water Tube Boiler - Procedu

This content covers all necessary stages in the production of the water tube boilers from the examination of the material, fabrication, welding inspection, dimensional inspection, NDE, hydrostatic testing to the final inspection, preservation and packing to despatch to the site.. You need to take this point in account this article is written for a typical Water Tube Boiler and might not be

Commissioning - M&E Prefunctional Checklis

2019-9-1 · Hydronic Hot Water Boiler(s), Unit ID #'s: _____ Associated Checklists: Piping (Hydronic) Calibrate or verify calibration of all sensors and thermostats, including temperature, pressure, flow, current, kW, rpm, Hertz, etc. Verify that the sensor readings in the control system are within the sensor accuracies specified in this section

Third Party Inspection for Water Tube Boiler - Procedu

This content covers all necessary stages in the production of the water tube boilers from the examination of the material, fabrication, welding inspection, dimensional inspection, NDE, hydrostatic testing to the final inspection, preservation and packing to despatch to the site.. You need to take this point in account this article is written for a typical Water Tube Boiler and might not be

Combustion analyzer calibration & accuracy

Combustion analyzer calibration & accuracy. Boon Posts: 238 Member. November 2017 in THE MAIN WALL. ripped out a perfectly good forced-air furnace and replaced it with hot water & radiators. 0 if you want to see precision instruments I'll show you my Tektronix storage scope or my Fluke 8060A DVMs that are rated at 0.05%.

Office Building Boiler Retrofit Design-Build Proje

2017-3-6 · ance the hot water flow through the boilers and the primary-secondary under each sequence of operation. Office Building Boiler Retrofit Design-Build Project Once the startup has been completed, the boiler technician and the O&M staff shall go through the boiler control initial dry-run