116 mw hot water boiler startup procedure

Contact Us

Product thermal capacity: 0.7 - 14 MW

Working pressure: 0.7 - 1.25 Mpa

Available fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Available industries: Heat supplying, hospital, hotel.

Introduction

WNS series horizontal internal combustion boiler is classic 3-pass wetback oil/gas fired boiler. After fuel is atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, called 1st pass; the high temperature flue gasses are collected in reversal chamber and then enter 2nd pass, which is grooved tube bundle area through heat convection, air temperature gradually falls and flows to front smoke box and enter 3rd pass, which is done in the smooth tube bundle area, and then through back smoke box lead to chimney and exhausted to the atmosphere.

Technical Advantages

Digitized Manufacture

The key processes including material cutting, rolling, drilling are made by advanced CNC machining process to reduce the assembly stress and extend boiler working lifetime.
The front and back smoke chamber plates are cut by CNC plasma cutting machine with tidy and beautiful look.

Easy Operation and Maintenance

Fully intelligent operation, with automatic adjustment and protection of burning, water level, temperature and steam pressure. The smoke box door uses the hinge structure for easy inspection, inventory and cleaning.

Long Service Life

The way to weld Smoke tube and tube sheet is to first expand to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boiler service life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint are test by radiographic inspection.
Fin tube uses ND steel or stainless-steel material to avoid corrosion in the low temperature.
Inspection stops are set up to guarantee the sequence of expanding and welding to avoid cracking of the tube sheet holes.

Less Fuel Consumption

High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below 45℃ and reduce heat lost.
Sufficient steam storage room and heating area to generate high quality steam and high thermal power.
Condenser is added to recycle the waste heat of the exhausted smoke to increase feeding water’s temperature and reduce flue gas emission temperature and increase the thermal efficiency over 98% and save operating cost.

Design Guidelines for an Optimum Scrubber System

xvEPA Design Guidelines for an Optimum Scrubber System Interagency Energy/Environment R&D Program Report 46 5-3 Survey of In-Line Reheat Systems Using Steam 50 5-4 Survey of In-Line Stack Gas Reheat Systems Using Hot Water 51 5-5 Survey of Indirect Hot Air Stack Gas Reheat Systems 52 5-6 Survey of Direct Combustion Stack Gas Reheat Systems

Steam generator part 2 - slideshare.n

Steam generator part 2 1. BOILER Prepared by: Mohammad Shoeb Siddiqui Sr. Shift Supervisor Saba Power Plant 2. Prepared by: Mohammad Shoeb Siddiqui Sr. Shift Supervisor Saba Power Plant Steam Generator (Boiler) Hello, I am trying to explain about Steam Generator (Boiler) in this session, due to length of said presentation, I am deciding to divide it in three parts. Part 1 cover the

DISTRIBUTED CONTROL SYSTEM (DCS) An

2013-12-9 · 10 Factory / Site Acceptance test procedure 94 – 103 11 General terms and conditions 104 – 114 12 Annexure I - u84 PLC architecture 115 – 115 with air from 2-nos FD fans one running and other being in hot standby mode. Boiler feed water pumps, Makeup water pumps, and drinking water pumps,

Hurst Boiler | Boiler Models| Plan Views | Spec Shee

High temperature water purged from the boiler's "surface" blow-off system carries valuable heat energy that is normally lost to the drain. A Hurst Boiler Heat Recovery System can reclaim this discarded wasted energy and transfer it to the boiler make-up water to increase of overall efficiency.

1 Technical Requirements - PG&E, Pacific Gas and Electr

2017-3-24 · Waste water from the CTG during and after an off-line water wash procedure shall be collected in a sump with capability to transfer the collected waste to the turbine building sump. 125 Water lines Condensate piping and hot suction piping 12 Heater drain piping 7 General Service Piping including Drinking, fire fighting, raw and 10

Furnaces | Oil and Gas Furnaces from Lennox Residenti

Lennox ® gas and oil furnaces are engineered to deliver perfect warmth, efficiency and energy savings. Delivering precise comfort and temperature control, Lennox furnaces can keep your home to within 0.5 degrees of your ideal temperature. As quiet as they are efficient, Lennox furnaces also startup and run perfectly quietly, helping to preserve the peace and quiet of your home.

RESEARCH REPORT 430 - Health and Safety Executi

2018-11-1 · RESEARCH REPORT 430. HSE Health & Safety Executive Offshore gas turbines (and major purposes ranging from industrial process heating to domestic hot water. Combined cycle gas turbine (CCGT) plant uses the residual heat to raise steam, which drives a steam turbine but this requires an auxiliary boiler on start up. On large

Steam generator part 3 - SlideSha

Steam generator part 3 1. BOILER Prepared by: Mohammad Shoeb Siddiqui Sr. Shift Supervisor Saba Power Plant which is considered to be the most dangerous part of the startup procedure. As the BMS controls the ignition of the burners the heater purge cannot be so easily bypassed. We recommend, however, that both steam and hot water

Industrial Process Heating - Technology Assessme

2015-2-13 · 1 Industrial Process Heating - Technology Assessment 2 3 Contents 4 49 mechanism by routing the hot gases through radiant burner tubes or panels and thus separated from 50 the material (i.e., indirect 87 Hybrid boiler systems combining a fuel-based boiler with an electric-based boiler

Boiler plant and auxiliaries - ScienceDire

This chapter discusses boiler plant and auxiliaries. The advantages of sectional boilers lie in the relatively small component part involved. As the life of a central-heating boiler is usually less than that of the building that it serves, the question of boiler replacement must be considered at an early stage in the design of a building and its services.

UTILITY OF THE FUTURE - MIT Energy Initiati

2017-5-18 · for policy makers, regulators, utilities, existing and startup energy companies, and other power-sector stakeholders to better understand the factors that are currently driving change in power systems worldwide. The report distills results and findings from more than two years of primary research, a review of the state of the art, and quantitative