BS 6644 2019 Specification for the installation and

Contact Us

Other Links

Product thermal capacity: 0.7 - 14 MW

Working pressure: 0.7 - 1.25 Mpa

Available fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Available industries: Heat supplying, hospital, hotel.

Introduction

WNS series horizontal internal combustion boiler is classic 3-pass wetback oil/gas fired boiler. After fuel is atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, called 1st pass; the high temperature flue gasses are collected in reversal chamber and then enter 2nd pass, which is grooved tube bundle area through heat convection, air temperature gradually falls and flows to front smoke box and enter 3rd pass, which is done in the smooth tube bundle area, and then through back smoke box lead to chimney and exhausted to the atmosphere.

Technical Advantages

Digitized Manufacture

The key processes including material cutting, rolling, drilling are made by advanced CNC machining process to reduce the assembly stress and extend boiler working lifetime.
The front and back smoke chamber plates are cut by CNC plasma cutting machine with tidy and beautiful look.

Easy Operation and Maintenance

Fully intelligent operation, with automatic adjustment and protection of burning, water level, temperature and steam pressure. The smoke box door uses the hinge structure for easy inspection, inventory and cleaning.

Long Service Life

The way to weld Smoke tube and tube sheet is to first expand to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boiler service life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint are test by radiographic inspection.
Fin tube uses ND steel or stainless-steel material to avoid corrosion in the low temperature.
Inspection stops are set up to guarantee the sequence of expanding and welding to avoid cracking of the tube sheet holes.

Less Fuel Consumption

High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below 45℃ and reduce heat lost.
Sufficient steam storage room and heating area to generate high quality steam and high thermal power.
Condenser is added to recycle the waste heat of the exhausted smoke to increase feeding water’s temperature and reduce flue gas emission temperature and increase the thermal efficiency over 98% and save operating cost.

IDEAL HARRIER GTS 5 INSTALLATION AN

View and Download IDEAL Harrier GTS 5 installation and servicing online. Gas and Fuel Oil. Harrier GTS 5 Boiler pdf manual download. Also for: Harrier gts 7, Harrier gts 6, Harrier gts 8, Harrier gts 9.

BS 6644 - 2011-11-30 - Beuth.

BS 6644 - 2011-11-30 Specification for the installation and maintenance of gas-fired hot water boilers of rated inputs between 70 kW (net) and 1.8 MW (net) (2nd and 3rd family gases). Inform now!

Hot Water Boiler Specification - lodgings-hamburg.

BS 6644:2011 Specification for the installation and . BS 6644:2011 Specification for the installation and maintenance of gas-fired hot water boilers of rated inputs between 70 kW (net) and 1.8 MW (net) (2nd and 3rd family gases) Learn More

Dealing with fume discharge at low leve

2013-6-24 · Dealing with fume discharge at low levels addressed under Annex F 'Best practice guides to the dispersion of combustion products' of BS 6644: 2011, Specification for the installation and maintenance of gas-fired hot water boilers of rated inputs between 70kW (net) and 1.8MW (net) (second and third family gases). the appropriate Local

BS 5440-1(2008) : 2008 | FLUEING AND VENTILATIO

buy bs 5440-1(2008) : 2008 flueing and ventilation for gas appliances of rated input not exceeding 70 kw net (1st, 2nd and 3rd family gases) - part 1: specification for installation of gas appliances to chimneys and for maintenance of chimneys from nsai

BS 5482-1:1994-Domestic butane- and propane-ga

2003-12-3 · Specifies installation of LPG whether from cylinders or bulk supply. Recommends a selection of materials, components and appliances, design considerations and installation, inspection and testing. British Standard - BSI Summary and Reference.

BS 5440-1:2008 - Techstre

BS 5440-1:2008 Flueing and ventilation for gas appliances of rated input not exceeding 70 kW net (1st, 2nd and 3rd family gases). Specification for installation of gas appliances to chimneys and for maintenance of chimneys. standard by BSI Group, 03/31/2008. View all product details

boiler with net specification - kuurnsezichten.

BS 6644:2011 Specification for the installation and . BS 6644:2011 Specification for the installation and maintenance of gas-fired hot water boilers of rated inputs between 70 kW (net) and 1.8 MW (net) (2nd and 3rd family gases) Get a quote

BS 6644:2011 - documentweb.o

BS 6644:2011 English Secure PDF Specification for the installation and maintenance of gas-fired hot water boilers of rated inputs between 70 kW (net) and 1.8 MW (net) (2nd and 3rd family gases) standard published 11/30/2011 by British Standards Institution

British Standards Institution - Committ

BS 6644:2011: Specification for the installation and maintenance of gas-fired hot water boilers of rated inputs between 70 kW (net) and 1.8 MW (net) (2nd and 3rd family gases) Categories: Water heating Withdrawn begins : 2013-01-21 Withdrawn BS 6644:2005+A1:2008

BSI - BS 6798 - Specification for selection, installatio

BS 5871-1 - Specification for the installation and maintenance of gas fires, convector heaters, fire/back boilers and decorative fuel effect gas appliances - Part 1: Gas fires, convector heaters, fire/back boilers and heating stoves (2nd and 3rd family gases)